2024 Street Rehabilitation Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Project Overview

Mill and Overlay 

Improvements with this proposed project are the rehabilitation of streets via a mill and overlay in the Mapledell, Heritage/Medicine Lake Highlands and Westridge Estates/Forster Preserve neighborhoods. (Click on the links below to view the project location map for each neighborhood.) A mill and overlay involves removing a portion of the existing pavement (milling) the edges of the street and applying a new layer of asphalt over the entire roadway.

View the Mapledell Project Area Map (PDF)
View the Heritage/Medicine Lake Highlands Project Area Map (PDF)
View the Westridge Estates/Forster Preserve Project Area Map (PDF)

Reclamation 

Nathan Lane, Schmidt Lake Road, 45th Avenue, and the Highway 169 Service Drive between Rockford Road and Schmidt Lake Road are proposed to be reclaimed. (Click on the link below to view the project location map.) Reclaiming involves completely grinding up the existing pavement to reuse it as the gravel base for paving the new roadway surface.

View the Nathan Lane, Schmidt Lake Road, 45th Avenue, Highway 169 Service Drive Project Area Map (PDF)

Preventative maintenance also performed with the project includes:

  • Installation of concrete pedestrian ramps, as necessary, in accordance with the Americans with Disabilities Act (ADA)
  • Replacement of concrete curb and gutter where the curb and gutter are in poor condition
  • Repairs to water main valves
  • Repairs to storm sewer catch basins
  • Repairs to sanitary sewer manholes
Anticipated Schedule
Additional Information
Project Presentations and Meetings

Contact

Tony Miller, Engineering Project Manager