Cimarron Ponds Street Reconstruction Project

Project Overview
The Cimarron Ponds project is located west of Vicksburg Lane on 10th and 12th Avenue and the adjacent cul-de-sacs.

Proposed improvements for the cul-de-sacs include total reconstruction, including replacement of all curb and gutter, with a proposed width of Cimmaron Ponds Recon Project28 feet from back of curb to back of curb, the current City standard. An edge mill and overlay, with some curb replacement is proposed on 10th Avenue and 12th Avenue. The existing utilities have been examined and are adequate at this time. Drain tile will be added to the bottom of the street section and then connected to the storm sewer to allow for proper drainage of the street subgrade.

Anticipated Schedule
Project has been completed.

Contact
Joe Paumen, Reconstruction Program Manager
Plymouth City Hall | 3400 Plymouth Blvd. | Plymouth, MN 55447-1485
P 763-509-5529 |jpaumen@plymouthmn.gov

Project Updates

eNotify Sign Up
Click the 'eNotify Sign Up' to receive email updates for the Cimarron Ponds Project - 2011. 

 

 

 